<tbody id="4di35"><nobr id="4di35"><optgroup id="4di35"></optgroup></nobr></tbody>

  1. <tbody id="4di35"><div id="4di35"><address id="4di35"></address></div></tbody>
    <tbody id="4di35"><div id="4di35"><address id="4di35"></address></div></tbody>
    1. MasTec | Infrastructure that Delivers Leading specialty contractor engineers, designs and constructs infrastructures for electric power generation and transmission, oil and natural gas pipelines, renewable energy facilities and wireless networks.
      Power Generation icon

      Douglas County Schools Solar Power Project - Installation of BIPV

      Solar | Denver, CO

      Scope of Work

      MasTec was awarded the EPC solar power contract to provide BOP procurement and solar power construction services for build out of 3.1mw of BIPV over 31 rooftops for the Denver County School System. The school district in Douglas County, Colorado is the state's third largest educational district. "This solar power project," Douglas County School District Board of Education president John Carson said, "will enable us to save thousands of dollars a year in electrical expenses, while also reducing our environmental impact. Completion of the BIPV projects will completed by year's end."

      Services Employed

      • BOP Procurement
      • Construction
      • Solar Power Contractor Services
      • Building Integrated Photo Voltaic Installation

      Related Projects

      Fermentation and BOP Expansion – Concrete
      Power Generation icon

      Fermentation and BOP Expansion – Concrete

      Alternative Fuels

      Watertown, SD
      Biomass Gasifier Project
      Power Generation icon

      Biomass Gasifier Project

      Ethanol Plant Expansion

      Benson, MN
      Wind Farm Construction - 51MW
      Power Generation icon

      Wind Farm Construction - 51MW

      Wind

      Burlington, CO
      305.599.1800 services@mastec.com
      逼里香